Multi-Link X2™ Universal ECG System, Extra-Long Lead Setup

Select Items are Part of AirLife Secure!

The Multi-Link™ X2 Universal ECG System Extra-Long Leadwire Configuration provides 9in reusable ECG cables for use with 12 ft disposable leadwires.
  • Official, validated ECG supplies and accessories for GE® HealthCare patient monitoring systems
  • Compatible with major bedside monitoring platforms including GE HealthCare®, Philips®, Mindray®, Spacelabs®, Dräger®, and Nihon Kohden®
  • One patient, one leadwire
  • 12 ft disposable leadwires keep the reusable cable far from the patient
  • Universal system helps reduce patient transfer time
  • Disposable leadwires help reduce cross-contamination
  • Cables and Adapters tested for chemical resistance of cleaning and disinfection agents
  • Compatibility tested within the hospital environment for signal accuracy according to AAMI 60601-2-27
Brand: Multi-Link™
AirLife Secure™
ItemDescriptionUseCompatibilityLengthQTY
2090100-041Cable, ECG, GE, 3/5-Lead, AHAReusableGE HealthCare20 cm / 9 in1
2090100-043Cable, ECG, GE, 6-Lead, AHAReusableGE HealthCare20 cm / 9 in1
2090100-045Cable, ECG, GE, 12-Lead, AHAReusableGE HealthCare20 cm / 9 in1
2090100-051Cable, ECG, Philips 3/5-lead, AHAReusablePhilips20 cm / 9 in1
2090100-053Cable, ECG, Philips, 6-lead, AHAReusablePhilips20 cm / 9 in1
2090100-055Cable, ECG, Philips 12-lead, AHAReusablePhilips20 cm / 9 in1
2090100-061Cable, ECG, Mindray, 3/5-lead, AHAReusableMindray20 cm / 9 in1
2090100-065Cable, ECG, Mindray, 12-lead, AHAReusableMindray20 cm / 9 in1
2090600-211Cable, ECG, Mindray Passport, 3-lead, AHAReusableMindray Passport20 cm / 9 in1
2090600-011Cable, ECG, Mindray Passport, 5-lead, AHAReusableMindray Passport20 cm / 9 in1
2090600-013Cable, ECG, Mindray Passport, 6-lead, AHAReusableMindray Passport20 cm / 9 in1
2090600-221Cable, ECG, Mindray Datascope, 3-lead, AHAReusableMindray Datascope20 cm / 9 in1
2090600-021Cable, ECG, Mindray Datascope, 5-lead, AHAReusableMindray Datascope20 cm / 9 in1
2090100-081Cable, ECG, Nihon Kohden, 3-lead, AHAReusableNihon Kohden20 cm / 9 in1
2090100-083Cable, ECG, Nihon Kohden, 6-lead, AHAReusableNihon Kohden20 cm / 9 in1
2090100-077Cable, ECG, Spacelabs, 3-lead, AHAReusableSpacelabs20 cm / 9 in1
2090100-071Cable, ECG, Spacelabs, 5-lead, AHAReusableSpacelabs20 cm / 9 in1
2090600-057Cable, ECG, Zoll X-Series, 3-lead, AHAReusableZoll X-Series20 cm / 9 in1
2090100-075Cable, ECG, Spacelabs, 12-lead, AHAReusableSpacelabs20 cm / 9 in1
2090600-037Cable, ECG, Physio Control, 3-lead, AHAReusablePhysio Control20 cm / 9 in1
2090600-061Cable, ECG, Zoll R-Series, 5-lead, AHAReusableZoll R-Series20 cm / 9 in1
2090600-031Cable, ECG, Physio Control, 5-lead, AHAReusablePhysio Control20 cm / 9 in1
2090600-051Cable, ECG, Zoll X-Series, 5-lead, AHAReusableZoll X-Series20 cm / 9 in10
2052133-405Leadwire, 3-Lead, Grabbers, AHADisposableUniversal3.6 m /12 ft10
2052104-405Leadwire, 3-Lead, Snaps, AHADisposableUniversal3.6 m /12 ft10
2052133-406Leadwire, 5-Lead, Grabbers, AHADisposableUniversal3.6 m /12 ft10
2052104-406Leadwire, 5-Lead, Snaps, AHADisposableUniversal3.6 m /12 ft10
2086367-006Leadwire, 6-Lead, Grabbers, AHADisposableUniversal3.6 m /12 ft10
2086349-006Leadwire, 6-Lead, Snaps, AHADisposableUniversal3.6 m /12 ft10
2052133-408Leadwire, V-Lead, Grabbers, AHADisposableUniversal3.6 m /12 ft10
2052104-408Leadwire, V-Lead, Snaps, AHADisposableUniversal3.6 m /12 ft10
2090600-067Cable, ECG, Zoll R-Series, 3-lead, AHAReusableZoll R-Series20 cm / 9 in1
Slide Out Text